A new production site of the company is located at the industrial and logistic park Northern Domodedovo that is 11 km southward of Moscow on the easily accessed highway M4 (a road to Kashira and Stupino).
As a result of movement of the production capacity to the new site during the years 2009-2010 the terms of production will be considerably improved and simultaneously an upgrade of equipment will be done.

Our production capacity

Manufacturing of flexible packaging materials in Multiflex is realized on a basis of a complete technological cycle. An effective production capacity of the company is 200 million square meters of finished goods a year.

Design studio

Design studio carries out an adaptation of customer’s art work to roto gravure printing standards, if needed, at presence of customer’s employee; prepares electronic versions of packaging’s image for further production; works out a colour separation and assigns tasks for engraving workshop

Prepress facility

Prepress facility produces roto gravure cylinders on three engravers and respective galvanic and mechanical equipment. The total number of cylinders is about 3000 pieces while monthly capacity of the facility is 900 cylinders that provides an operability and flexibility under execution of urgent orders

Printing workshop

Printing workshop includes six modern roto gravure presses allowing to print up to ten inks at the web of 1250 mm of width

Co-extrusion

Co-extrusion workshop consists of a five layer cast machine and two three layer blown machines enable the company to manufacture polymer films with many consumer properties and to secure an independency of the company from irregularity of outside film supply.

There are eight solvent base and solventless laminators and extrusion laminator as well as 13 slitter-rewinders in the lamination and slitting workshop.

A new production site of the company is located at the industrial and logistic park Northern Domodedovo that is 11 km southward of Moscow on the easily accessed highway M4 (a road to Kashira and Stupino).

As a result of movement of the production capacity to the new site during the years 2009-2010 the terms of production will be considerably improved and simultaneously an upgrade of equipment will be done.